Abstract
Maintenance and spare part should be considered jointly as they are related activities and maintenance generates the demand of spare parts. In this study, a joint optimization policy of block replacement and spare parts inventory for multi-components system is proposed by simulation optimization approach using Monte Carlo simulation. Through analyzing the process of maintenance replacement and spare inventory within replacement interval T, the total expected cost can be derived. The expected cost per unit time is the objective function to optimize the block replacement interval T and maximum inventory level S. Monte Carlo method is used to simulate the operate process and simulation algorithm is presented to derive the approximate optimal solution. Finally, a numerical example is presented to illustrate the effectiveness of the proposed model. Sensitivity analysis and the effect of relevant parameters on the optimal decisions are discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of System Assurance Engineering and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.