Abstract
We consider a job-shop scheduling problem with n jobs and the constraint that at most p<n jobs can be processed simultaneously. This model arises in several manufacturing processes, where each operation has to be assisted by one human operator and there are p (versatile) operators. The problem is binary NP-hard even with n=3 and p=2. When the number of jobs is fixed, we give a pseudopolynomial dynamic programming algorithm and a fully polynomial time approximation scheme (FPTAS). We also propose an enumeration scheme based on a generalized disjunctive graph, and a dynamic programming-based heuristic algorithm. The results of an extensive computational study for the case with n=3 and p=2 are presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.