Abstract
This paper studies the uncertain scheduling problem of the oxidation/deposition/diffusion work area in semiconductor manufacturing, where fluctuations in arrival times and processing times are considered. To overcome the shortcomings of the conventional schedule, which has a fixed processing machine and starting time for each operation, we design a new form of schedule called the job-priority based soft schedule. Its basic idea is to assign global priority to each job in advance, and to make remaining decisions (including batch formation, machine assignment and real-time dispatching) in the process of implementing the initial soft schedule. Then we develop a job-priority based soft scheduling approach that involves two layers: (1) in the offline optimisation layer, an initial soft schedule is obtained by a proposed hybrid harmony search algorithm; (2) in the online dispatching layer, the remaining decisions are made in real time by a designed online heuristic rule. The comparative experimental results demonstrate that the two-layer soft scheduling mechanism can effectively adapt to an uncertain production environment due to its integration of the global optimisation perspective and local flexibility.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.