Abstract

Brazilian petrobras is one of the world largest oil companies. Recurrently, it faces a very difficult planning and scheduling problem: how to operate a large pipeline network in order to adequately transport oil derivatives and biofuels from refineries to local markets. In spite of being more economical and environmentally safer, the use of a complex pipeline network poses serious operational difficulties related to resource allocation and temporal constraints. The current approaches known from the literature only consider a few types of constraints and restricted topologies, hence they are far from being applicable to real instances from petrobras. We propose a hybrid framework based on a two-phase problem decomposition strategy. A novel Constraint Programming (CP) model plays a key role in modelling operational constraints that are usually overlooked in literature, but that are essential in order to guarantee viable solutions. The full strategy was implemented and produced very adequate results when tested over large real instances.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.