Abstract
To reduce the negative impacts of highway maintenance on traffic, lane-closure schedules, work-zone configurations, and traffic-control strategies should be carefully planned. In this article, optimization techniques are applied to determine the appropriate work-zone plans which can minimize the total costs including agency costs, road-user delay costs and accident costs, subject to working time constraints. A heuristic optimization algorithm, named two-stage modified simulated annealing (2SA), is developed to search for an optimized solution with a hybrid objective function evaluation approach (H2SA). After the decision variables are preoptimized analytically in the first stage, refined optimization is performed based on microscopic simulation models in the second stage. The results of a numerical experiment demonstrate that the H2SA can yield satisfactory solutions, which are close to the best optimization solutions based on simulation (S2SA) but obtained with much less computation time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.