Abstract

We address a multi-objective version of the car sequencing problem, which consists in sequencing a given set of cars to be produced in a single day, minimizing the number of violations of assembly constraints and the number of paint color changes in the production line. We propose a set of heuristics for approximately solving this problem, based on the paradigms of the VNS and ILS metaheuristics, to which further intensification and diversification strategies have been added. Computational results on real-life test instances are reported. The work presented in this paper obtained the second prize in the ROADEF challenge 2005 sponsored by Renault.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.