Abstract
PurposeGreen supplier selection is one of the crucial activities in green supply chain management. However, limited studies have addressed the vagueness and complexities during the selection process, particularly in multi-criterion decision-making (MCDM) circumstances. Hence, the purpose of this paper is to develop a group decision model using a modified fuzzy MCDM approach for green supplier selection under a complex situation.Design/methodology/approachThe proposed study develops a framework for sorting decisions in green supplier selection by using the hesitant fuzzy qualitative flexible multiple attributes method (QUALIFLEX). The synthetic consistent or inconsistent indexes were used to calculate all alternative suppliers by normalizing the hesitant fuzzy decision matrix.FindingsThe proposed framework has been successfully applied and illustrated in the case example of CB02 contract section in Hong Kong–Zhuhai–Macau Bridge project. The results show various complicated decision-making scenarios can be addressed through the proposed approach. The synthetic (in)consistent indexes are able to calculate all alternative suppliers by normalizing the hesitant fuzzy decision matrix.Originality/valueThe research contributes to improving accuracy and reliability decision-making processes for green supplier selection, especially under vagueness and complex situations in megaprojects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Engineering, Construction and Architectural Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.