Abstract

This paper addresses batch scheduling at a back-end semiconductor plant of Nexperia. This complex manufacturing environment is characterized by a large product and batch size variety, numerous parallel machines with large capacity differences, sequence and machine dependent setup times and machine eligibility constraints. A hybrid genetic algorithm is proposed to improve the scheduling process, the main features of which are a local search enhanced crossover mechanism, two additional fast local search procedures and a user-controlled multi-objective fitness function. Testing with real-life production data shows that this multi-objective approach can strike the desired balance between production time, setup time and tardiness, yielding high-quality practically feasible production schedules.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call