Abstract
This paper addresses batch scheduling at a back-end semiconductor plant of Nexperia. This complex manufacturing environment is characterized by a large product and batch size variety, numerous parallel machines with large capacity differences, sequence and machine dependent setup times and machine eligibility constraints. A hybrid genetic algorithm is proposed to improve the scheduling process, the main features of which are a local search enhanced crossover mechanism, two additional fast local search procedures and a user-controlled multi-objective fitness function. Testing with real-life production data shows that this multi-objective approach can strike the desired balance between production time, setup time and tardiness, yielding high-quality practically feasible production schedules.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the International Conference on Automated Planning and Scheduling
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.