Abstract

In this paper, the problem of simultaneous scheduling of machines and identical automated guided vehicles (AGVs) in flexible manufacturing systems is addressed with the objective of minimizing the makespan. This problem is composed of two interrelated decision problems: the scheduling of machines, and the scheduling of AGVs. Both problems are known to be NP-complete, resulting in a more complicated NP-complete problem when they are considered simultaneously. A new hybrid Genetic-algorithm/heuristic coding scheme is developed for the studied problem. The developed coding scheme is combined with a set of genetic algorithm (GA) operators selected from the literature of the applications of GAs to the scheduling problems. The algorithm is applied to a set of 82 test problems, which was constructed by other researchers, and the comparison of the results indicates the superior performance of the developed coding.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.