Abstract

A closed-loop supply chain (CLSC) network consists of both forward and reverse supply chains. In this paper a CLSC network is investigated that involves four echelons in a forward direction including suppliers, manufacturer, distribution center and demand market, and three echelons in a backward direction including disposal, rework and collection centers. This paper presents a bi-objective model in order to design a network of bi-directional facilities in logistics network under uncertainties. Its objectives are to minimize the total costs as well as the total defective rate, disposal rate and pollution production rate. To solve the model, a hybrid solution approach is applied that combines fuzzy possibilistic programming and fuzzy multi-objective programming. Furthermore, in order to illustrate the validity of the model and applicability of the proposed solution approach, numerical experiments and the related sensitivity analysis are provided. Finally, the conclusion is provided.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.