Abstract

This paper describes a hybrid approach to handle disassembly sequence planning for maintenance. The product under maintenance is first modeled using a novel hybrid graph known as Disassembly Constraint Graph (DCG) which embodies complete disassembly information and can be used to prune the search space of disassembly sequences. Subsequently, a novel Tabu-enhanced GA engine is invoked to generate the near optimal disassembly sequences. A case study was used to illustrate the effectiveness of the proposed approach. The details of the DCG, the TS-enhanced GA engine and the fitness function used are presented in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.