Abstract

SummarySelective maintenance is often applied in many industrial environments where maintenance is performed between sequence missions. When the mission time is stochastic and there are multiple maintenance workers with different capacities, the system reliability of the next work mission can be maximized by using a stochastic model under the constraint of the limit maintenance time. The optimal maintenance strategy is obtained with an optimization algorithm. A simulation was performed to verify the validity and feasibility of the proposed model.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call