Abstract

A scheme of muon production for debugging and test of a muon collider is outlined. μ+ and μ− microbunches are generated simultaneously, at high energy, with high brilliance and pointing to the same direction, by annihilation of e+ and e− stored in two rings located in the same tunnel and running at the same energy E. e+ and e− bunches cross each other repeatedly along the muon beam line, that they traverse respectively at angles ±α, chosen so that the total muon energy in the lab is E−mμ.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.