Abstract

In the mid-1990's, the Sparrows Point Steel Plant began an initiative to achieve 100% on time slab availability to the hot strip mill. At that time, order dressing, heat building, slab application, and mill scheduling of strip product orders were manually intensive activities. It was decided to implement an integrated system to automate these activities. In this paper we discuss the central activity of this system—the application of slabs to strip product orders (used for appliance panels, steel storage sheds, food cans, etc.). A binary integer linear programming formulation will be given for the slab application problem. However, because of the size of typical problem instances, a robust and efficient hierarchical heuristic solution approach was developed that has been in daily use since 1999.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.