Abstract

The objective of this research was to schedule project activities based on maximum net present value (NPV) and minimum duration. A new hybrid heuristic based on the combination of minimum late start (MLS) and shortest processing time (SPT) priority-rules heuristics was developed. The new late start and shortest processing time (LSSPT) heuristic was tested using 60 problems of the Patterson set, and results compared with 4 other heuristics. To test all 5 previous heuristics, 5 computer programs were developed. Statistical analysis was performed. Results indicate that the new heuristic produced better and encouraging results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.