Abstract

In the process of the integrated scheduling of multi-variety and small-batch complex products, the process structure and attribute characteristics are often ignored, which affects the overall scheduling effect. Aiming at solving this problem, a heuristic integrated scheduling algorithm (HIS-IDA) based on the improved Dijkstra algorithm is proposed. The algorithm takes the processing time of the process itself as the path value of the preceding and the following adjacent processes. Firstly, the improved Dijkstra algorithm prioritized the scheduling of the process sequence with long longitudinal paths and realized the “longitudinal optimization” of the integrated scheduling. Secondly, the layer priority strategy is used to shorten the interval time of process processing and realize the “horizontal optimization” of integrated scheduling. On the basis of “vertical and horizontal optimization”, the idle time of the equipment is further reduced by using the process priority strategy of the leaf node, and the “idle optimization” of the integrated scheduling is realized, so as to optimize the overall effect of the integrated scheduling. The effectiveness and superiority of the algorithm are proved using comparison analysis.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.