Abstract

Presents an investigation of how partner selection problems may be optimized by the use of a precedence network of subprojects. At the start, the problem is described by a model with the subscript type of variables and a non-analytical objective function. It cannot be solved by general mathematical programming methods. By using the fuzzy rule quantification method, a fuzzy logic-based decision-making approach for the project scheduling is proposed. We then develop a fuzzy decision embedded heuristic genetic algorithm (GA/FD) to find the solution for partner selection. The approach was demonstrated by the use of an experimental example drawn from a coal-fired power station construction project. The results show us that the suggested approach can quickly achieve the optimal solution for large-sized problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.