Abstract
In this paper, we develop a heuristic bidding price decision algorithm in consideration of cost estimation accuracy under limited engineering Man-Hours (MH) in Engineering, Procurement, Construction (EPC) projects. It allocates engineering MH for cost estimation, which determines the cost estimation accuracy, to each order under the limited volume of MH, and then determines the bidding price for maximizing the expected profit based on cost estimation accuracy under the deficit order probability constraint. Numerical examples show that the bidding price decision in consideration of cost estimation accuracy and deficit order probability is essential for the contractor in making a stable profit in EPC projects, and that the developed algorithm is effective for making such bidding price decision.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.