Abstract
The paper presents the influence of the waiting time of jobs in a 2 machine k- job Flow Shop Scheduling (FSS) problem. The main intention of the study is to find a sequence of jobs that delivers the least sum of the time of waiting for jobs. A heuristic approach has been adopted to achieve the desired objective. The experiments are conducted for more than 2000 problems of various sizes for the problems with special structures and problems with random times of processing. The weighted mean absolute error (WMAE) for the average of the sum of the waiting times of jobs is computed for both kind of problems after comparing with the optimal solutions. WMAE has been obtained less than 0.0075 for problems with special structures and less than 0.087 for problems with random times of processing. The WMAE is also reducing significantly with the increase in job size. The results demonstrate that the presented step-by-step procedure of the heuristic delivers significantly close to optimal solutions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.