Abstract

This paper is an attempt to study general flow shop scheduling problem in which processing time of jobs is associated with probabilities under no-idle constraint. The objective of this paper is to develop a heuristic algorithm to flowshop scheduling so that no machine remains idle during working for any given sequence of jobs. The proposed algorithm is simple, and easy to understand and provides an important tool in many practical situations for minimizing the expected hiring cost of the machines for a fixed sequence of job processing. A numerical illustration is also given to justify the proposed algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.