Abstract

Objectives: The objective of PMU placement in power system in a cost effective way to determine a minimum set of PMUā€™s so that the whole system is observable. Methods/Analysis: This paper presents a simple heuristic method. The principle is based on system topology that a PMU placed at a node should not create more than one unobservable islands. In order to use this principle, a condition, defined as tree break condition is used. Findings: The results obtained with this heuristic method are placement location of PMUs, observability of system with and without zero-injections under normal operating conditions and for line outage contingency. The systems used are typical 6, 7 bus systems and IEEE 14, 30, 57 bus systems. Novelty/Improvement: The results obtained by this method are simple, optimum and efficient than the methods used previously.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.