Abstract

Part type selection and machine loading are two major problems in the production planning of flexible manufacturing systems (FMS). The two problems are viewed as selecting subsets from the jobs of part types in a planning horizon and allocating jobs of the subsets among machines. In this paper, in order to develop a practical and efficient approach to solving FMS production planning problems, a heuristic algorithm is suggested that develops heuristic rules with the objective of minimisation of the number of tool changes and minimisation of the imbalance in per machine. To compare the proposed algorithm, a series of computational experiments is done on randomly generated test problems and the results show that the developed algorithm is very simple and efficient.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.