Abstract

AbstractIn this paper we propose an efficient parallel job scheduling algorithm for a grid environment. The algorithm implies two stage scheduling. At the first stage, the algorithm allocates jobs to the suitable machines, where at the second stage jobs are independently scheduled on each machine. Allocation of jobs on the first stage of the algorithm is performed with use of a relatively new evolutionary algorithm called Generalized Extremal Optimization (GEO). Scheduling on the second stage is performed by some proposed heuristic. We compare GEO-based scheduling algorithm applied on the first stage with Genetic Algorithm (GA)-based scheduling algorithm. Experimental results show that the GEO, despite of its simplicity, outperforms the GA algorithm in all range of scheduling instances.Keywordsgrid computingevolutionary algorithmgeneralized extremal optimizationparallel job

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.