Abstract

AbstractThis paper presents a Grey-Markov forecasting model for forecasting the electric power requirement in China. This method takes into account the general trend series and random fluctuations about this trend. It has the merits of both simplicity of application and high forecasting precision. This paper is based on historical data of the electric power requirement in China, and forecasts and analyzes the electric power requirement in China by the Grey–Markov forecasting model. The forecasting precisions of Grey-Markov forecasting model from 2002 to 2004 are 99.42%, 98.05% and 97.56%, and those of GM(1,1) grey forecasting model are 98.53%, 94.02% and 88.48%. It shows that the Grey-Markov forecasting models have higher precision than GM(1,1) grey forecasting model. The results provides scientific basis for the planned development of the electric power supply in China.KeywordsForecast ModelTransition Probability MatrixState IntervalState Transition ProbabilityTrend CurveThese keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.