Abstract

In this paper, we develop an approach for scheduling slabs at continuous casters in the steel industry. The scheduling approach incorporates specific constraints such as flexible production orders, material supply in batches and different setup types. We further introduce a continually adjustable casting width, which corresponds to a technological control parameter. We present a new MILP model formulation, which integrates slab design and scheduling. Solutions for the model are obtained by a greedy randomized adaptive search procedure. We analyze the applicability and performance of the approach in a numerical case study which is based on real world data. High-valued feasible production plans can be obtained in reasonable computing time. The approach is able to solve industry size problem instances in reasonable time. As compared to the status-quo, on average savings in the number of charges of 10.6 % are obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.