Abstract

We analyze a heterogeneous workforce assignment problem in which the minimum number of workers required to carry out a machine load plan is calculated. The problem is formulated as a restricted vertex colouring problem and a branch and bound algorithm is presented. The special characteristics of the graph to be coloured allow an efficient implementation of the branch and bound. Computational results show that the algorithm can solve problems of 50 activities, 5, 10 and 15 machines and between 2 to 15 different types of workers in just a few seconds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.