Abstract
In deregulated electrical systems, production schedule for power plants is the result of an auction process. In the Spanish case, this schedule includes two main concepts: energy production (to be actually produced) and secondary reserve (to maintain available). The generation company faces the problem of converting energy schedule into a power schedule, respecting the reserve schedule as well as technical constraints, and trying to accomplish different goals: to minimise the production costs, to obtain smooth shapes for the power schedules and to optimise eventual compensation in schedules. A weighted goal mixed integer programming model with a real-size application to deal with this problem is presented.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.