Abstract
Due to the increase in investments in construction projects and the lack of practical models in this area developing new practical models is essential. In this paper, researchers suggest a new model in which (1) its assumptions are adopted based on the real world, (2) goal programming is used because of the soft nature of the budget constraints; and (3) risk of variations in cash flows is considered. The presented model chooses the most profitable portfolio of projects and determines their respective financing resources, area under construction, and pre-sale and sale amounts for each period such that the cumulative cash flow at the end of the time horizon is maximized. The fuzzy analytic hierarchy process (FAHP) is used to determine the weight of the objectives. The exact solution to the model is obtained using the ILOG CPLEX software. The presented solution seems efficient; since it yields very small elapsed times to exactly solve the real-world-sized problems. Also, the sensitivity analysis is performed and the results are deliberately studied and analyzed. Parameters such as pre-sale prices, mean and variance of the sale price and construction costs are among the highly sensitive parameters.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.