Abstract

This article successfully gives an elaboration on the operating principle of seismic reflection, acoustic logging as well as the methods and techniques through the engineering geological investigation on Maojingba super long tunnel, and resolves the key technical issues, thus providing valuable references for future similar projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.