Abstract
Reservoir simulation is critical to the design of reservoir development plan and has been extensively used. However, it is challengeable for to simulate the production process for fractured reservoirs, because of the fracture geometry and the fracture deformation. Specifically, three problems need to be solved. First, there is a lack of mathematical models that can predict the fracture deformation with acceptable precision. Second, the fracture deformation is stress-dependent; therefore, a geocoupled equation should be used to quantify the stress change, but the solution is extremely expensive. Third, the fracture geometries pose great challenges to traditional gridding techniques. This paper proposes a new geocoupling simulation method that is capable of modeling the complex fracture geometry as well as the fracture mechanical behavior. The geomechanical effects and the reservoir production performance are modeled through an implicit geocoupled model, which is developed based on the poro-mechanics theory. The fixed stress strategy is used to solve the geocoupled equations. Moreover, a comprehensive fracture modeling method is proposed, in terms of the fracture deformation model and the fracture gridding technique to model the fracture effects. Ultimately, this method is used to analyze two field-scale cases. The results demonstrate that this method exhibits good practicability and has practical significance for fractured reservoir development.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.