Abstract

A Micro Hydropower Plant (MHPP) is a suitable and effective mean to provide electric power to rural remote communities without harming the environment. However, the lack of resources and technical training in these communities frequently leads to designs based of rules of thumb, compromising both the generation capacity and efficiency. This work makes an attempt to address this problem developing a new tool to design the layout of MHPP. The tool relies on a discrete topographic survey of the terrain and makes use of a Genetic Algorithm (GA) to optimize the installation layout, making it possible to explicitly incorporate needs and constraints such as power supply requirement, cost of the installation, available water flow, and layout feasibility in accordance with the real terrain profile. The algorithm is applied to a real scenario in a remote community in Honduras, demonstrating its capability to optimize these kind of installations.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.