Abstract

A genetic algorithm is applied to the problem of determining the optimal hourly schedule of power generation in a hydrothermal power system. A multi-reservoir cascaded hydroelectric system with a nonlinear relationship between water discharge rate, net head and power generation is considered. The water transport delay between connected reservoirs is also taken into account. The main control parameters that affect the genetic algorithm performance are discussed and a summary of the theoretical basis of the genetic algorithm method is presented. It is shown that a multiple step genetic algorithm search sequence can provide the optimal hourly loading of the system generators.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.