Abstract

This paper studies a multi-stage and parallel-machine scheduling problem with job splitting which is similar to the traditional hybrid flow shop scheduling (HFS) in the solar cell industry. The HFS has one common hypothesis, one job on one machine, among the research. Under the hypothesis, one order cannot be executed by numerous machines simultaneously. Therefore, multiprocessor task scheduling has been advocated by scholars. The machine allocation of each order should be scheduled in advance and then the optimal multiprocessor task scheduling in each stage is determined. However, machine allocation and production sequence decisions are highly interactive. As a result, this study, motivated from the solar cell industry, is going to explore these issues. The multi-stage and parallel-machine scheduling problem with job splitting simultaneously determines the optimal production sequence, multiprocessor task scheduling and machine configurations through dynamically splitting a job into several sublots to be processed on multiple machines. We formulate this problem as a mixed integer linear programming model considering practical characteristics and constraints. A hybrid-coded genetic algorithm is developed to find a near-optimal solution. A preliminary computational study indicates that the developed algorithm not only provides good quality solutions but outperforms the classic branch and bound method and the current heuristic in practice.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call