Abstract
This study examines a dual-flow shop-scheduling problem that allows cross-shop processing. The scheduling objective is to minimize the coefficient of variation of slack time ( lateness), where the slack time (ST) of a job denotes the difference between its due date and total completion time. This scheduling problem involves two decisions: job route assignment (assigning jobs to shops) and job sequencing. This study develops a genetic algorithm (GA) embedded with the earliest due date ( EDD) dispatching rule for making these decisions. Numerical experiments with the GA algorithm indicate that the performance of adopting a cross-shop production policy may significantly outperform that of adopting a single-shop production policy. This is particularly true when the two flow shops are asymmetrically designed. This study develops a grouping heuristic algorithm to reduce setup time and due-date-based demand simultaneously. This study uses the proposed genetic algorithm (GA) to prove that the grouping heuristic algorithm performs well. Obtaining an approximate optimal solution makes it possible to decide the route assignment of jobs and the job sequencing of machines.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.