Abstract

In this paper we consider a scheduling problem where a set of jobs are simultaneously available for processing in a no-wait two-machine flowshop. All jobs are processed on both machines in batches. Batching machines can process several tasks per batch so that all tasks of the same batch start and complete together. The batch processing time for the first machine is equal to the maximal processing time of the tasks in this batch, and for the second machine is equal to the sum of the processing times of the tasks in this batch. The objective is to minimize the makespan, i.e. the maximum completion time of the jobs with using genetic algorithm and finding the bestscheduling jobs.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.