Abstract

Due to the severity of resource consumption and uncertainty in orders, new challenges have arisen for production scheduling in enterprises. This paper studies the scheduling problem of minimising the total weighted tardiness for jobs with fuzzy processing times and due dates on identical parallel machines with resource constraint. To address this research problem, we first propose methods to calculate the upper bound of resource consumption and the maximum number of machines that can be used, effectively reducing the search space and improving the algorithm's efficiency. Secondly, a local search algorithm based on job swapping is proposed to enhance the algorithm's performance. Then, repair algorithms based on job removal and job swapping are designed to repair infeasible solutions. Finally, we propose a fuzzy genetic algorithm (FGALS) to solve the problem based on the above elements. Through extensive simulation experiments, the effectiveness and efficiency of the FGALS algorithm are verified by comparing it with commercial solver Gurobi and several meta-heuristic algorithms.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.