Abstract

U-shaped assembly lines are widely used to implement just-in-time manufacturing. U-shaped assembly line balancing problem is important to improve productivity. Most of the studies ignore uncertainty such as operation times. This study applies robust optimisation method to deal with type-II U-shaped assembly line balancing problem (UALBP-2) under uncertainty. A mathematical programming model is proposed with interval task operation times, and a genetic algorithm is developed to deal with it. A robust solution is defined as the most frequent solution falling within a pre-specified percentage of the optimal solution for different sets of scenarios. The experimental results are compared with the expected solution to verify the feasibility and effectiveness of the robust method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.