Abstract
This paper investigates parallel machine scheduling problems where the objectives are to minimize total completion times under effects of learning and deterioration. The investigated problem is in NP-hard class and solution time for finding optimal solution is extremely high. The authors suggested a genetic algorithm, a well-known and strong metaheuristic algorithm, for the problem and we generated some test problems with learning and deterioration effects. The proposed genetic algorithm is compared with another existing metaheuristic for the problem. Experimental results show that the proposed genetic algorithm yield good solutions in very short execution times and outperforms the existing metaheuristic for the problem.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Applied Metaheuristic Computing
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.