Abstract

In this study, interval mathematical programming (IMP), m λ -measure, and fuzzy chance-constrained programming are incorporated into a general optimization framework, leading to a generalized interval fuzzy chance-constrained programming (GIFCP) method. GIFCP can be used to address not only interval uncertainties in the objective function, variables and left-hand side parameters but also fuzzy uncertainties on the right-hand side. Also, it can reflect the aspiration preference of optimistic and pessimistic decision makers due to the integration of m λ -measure. The developed method is applied to the long-term planning of a domestic wastewater management system in the city of Kunming, China, with consideration of the eco-environmental protection of downstream water body. The solution results of the GIFCP method can generate a series of optimal wastewater allocation patterns and WTPs capacity expansion schemes under different risk levels, provide in-depth insights into the effects of uncertainties, and consider the proper balance between system cost and risk of constraint violation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call