Abstract
High-voltage circuit breakers are among the most critical elements of the switching nodes of the power system. The localization of failures and the restoration of the normal operational mode of the power system are largely determined by the reliable operation of circuit breakers when switching off short circuit currents. This paper presents a fuzzy logic-based method to estimate the reliability of high-voltage SF6 circuit breakers and to set priorities for the maintenance schedule. In this method a realistic mathematical model is combined with a fuzzy inference system, and its effectiveness was tested with a MATLAB-Simulink model. Based on the simulation results, a preventive maintenance strategy for high-voltage SF6 circuit breakers can be proposed for particular operational states and conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.