Abstract

Job scheduling in wafer fabrication factories is subject to many sources of uncertainty or randomness. To consider the uncertainty and improve the scheduling performance in a wafer fabrication factory, this paper proposes an innovative fuzzy rule that solves the problem of slack overlapping in a non-subjective way. The fuzzy rule considers the uncertainty in the remaining cycle time and is aimed at the simultaneous optimization of the average cycle time and cycle time standard deviation. Few existing publications discuss this issue. A systematic procedure has also been established to optimize the value of the adjustable parameter in the fuzzy rule. On the other hand, a novel fuzzy back propagation network approach is also proposed in this paper to estimate the remaining cycle time accurately. The performance of the proposed methodology is evaluated with a series of production simulation experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.