Abstract

A plant construction project always involves lots of activities. Precise information about the activities duration is unfortunately unavailable due to the uncertain resources capacity. The fuzzy program evaluation and review technique (PERT) has been widely applied to solve the fuzzy project scheduling problem. This paper presents an extended fuzzy PERT approach with four major improvement aspects to support the construction project scheduling management: 1) Evaluate operation fuzzy times based on available working volumes, resources quantity and fuzzy capacity of resources, 2) Adopting a maximal ilevelcut method to compare the fuzzy precedent activities times to determine the reasonable earliest starting times of each activity, 3) Using fuzzy algebra method instead of fuzzy subtraction method to compute the fuzzy latest starting times and 4) Developing a project scheduling risk index (PSRI) to assist the decision maker to evaluate the project scheduling risk. Simulations experiments are conducted and demonstrated satisfactory results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.