Abstract

With new developments in technologies, grid- connected photovoltaic (PV) systems are becoming increasingly attractive as a generation technology, due to many factors, including environmental concerns and transmission congestion management. Additionally, PV generators are often paired with energy storage elements, such as batteries, to store excess power generated during off-peak hours to be returned to the system when generation is more expensive. For system economic operation, the PV/battery commitment and dispatch must be optimal. However, the generation is not known in advance, as it is dependant on weather factors that are not completely predictable. This paper presents a unit commitment and economic dispatch solution for the PV/battery system using fuzzy optimization to model the uncertainty in PV generation based on mixed-integer programming.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.