Abstract

A fuzzy-neural fluctuation smoothing rule is proposed in this study to improve the performance of scheduling jobs with various priorities in a semiconductor manufacturing factory. The fuzzy-neural fluctuation smoothing rule is modified from the well-known fluctuation smoothing rule by improving the accuracy of estimating the remaining cycle time of a job, which is done by applying Chen's fuzzy-neural approach with multiple buckets. To evaluate the effectiveness of the proposed methodology, production simulation is also applied in this study. According to experimental results, incorporating a more accurate remaining cycle time estimation mechanism did improve the scheduling performance especially in reducing the average cycle times. Besides, the fuzzy-neural fluctuation smoothing rule was also shown to be a Pareto optimal solution for scheduling jobs with various priorities in a semiconductor manufacturing factory.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.