Abstract

The likelihood of a project delay is affected by different factors; thus, there is a pressing need to develop a method that estimates the likelihood of such a delay. In this paper, analysis of potential occurrences of delays, which are classified into procedural, enabling, and triggering causes, is performed using the fuzzy fault-tree analysis method. Subjective judgment expresses causes of delay and their respective degree of effectiveness which are analysed in this study. The fuzzy triangular model and translational models are employed in this study. The severity of the likelihood of the project delay is the result of this analysis. A model was developed to assess the likelihood of the project delay. Evaluation of the model was performed for applicability and adequacy of the model. On average, evaluation performed by independent construction engineers and fuzzy logic experts produced satisfactory results.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call