Abstract

Use of combined cycle power generation plant has increased dramatically over the last decade. A supervisory control approach based on a dynamic model is developed, which makes use of proportional-integral-derivative (PID), fuzzy logic and fuzzy PID schemes. The aim is to minimize the steam turbine plant start-up time, without violating maximum thermal stress limits. An existing start-up schedule provides the benchmark by which the performance of candidate controllers is assessed. Improvements regarding possible reduced start-up times and satisfaction of maximum thermal stress restrictions have been realized using the proposed control scheme.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.