Abstract

The aim of this paper is to present a proposed methodology to select optimal scheduling rule for robotic flexible assembly cells based fuzzy decision support system. Six common scheduling rules are considered, and three independent objectives, namely, the minimising of makespan (Cmax), total tardiness (TD) and percentage of tardy jobs (%T) are measured. A fuzzy decision support system is implemented using the Matlab fuzzy toolbox. The final results demonstrate the effectiveness of the proposed methodology to select optimal scheduling rule in a multi-product assembly environment.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.