Abstract

In this study, fuzzy mean and range control charts were used to follow the feeding material and concentrate production line of Eti Aluminum Co. Fuzzy control charts were collected from the factory over a period of time and compared to Shewhart control charts used by the factory. The results showed that fuzzy control charts detected errors in the production process more accurately than Shewhart control charts. This method has increased quality and efficiency. Process capability indices (PCIs) provide numerical measures as to whether a process has confirmed the defined capability prerequisite. These were used to measure the process's ability to decide how well it meets specification limits (SLs). PCIs have been implemented by companies to evaluate quality and efficiency performance. Fuzzy process capability analysis using X-R control charts gave more accurate results.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call