Abstract

A method is described for designing, fabricating and implementing sequential template immediate loading protocols for dual arch implant therapy. A 41-year-old medically-free patient with terminal dentition was treated following stackable guide loading protocols for maxillary and mandibular arches. Implants were placed following extractions and immediately loaded with full arch fixed prostheses. Healing was uneventful and all implants integrated successfully. Special consideration was given to the design and clinical challenges when implementing stackable guide protocols for dual arch implant therapy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.