Abstract
The decision to choose between onsite and offsite construction is important in the effort toward sustainable construction. Offsite construction is often promoted as an environmentally friendly approach to construction operations. However, previous studies have shown that there is a lack of clarity on the environmental trade-offs between onsite and offsite construction. Factors that can affect the decision to build onsite or offsite include the availability of a local offsite manufacturing facility, the distance of the offsite factory to the final place of use, the proximity of the site to the local supply of material and labor, etc. This study provides a framework to apply the system dynamic modeling technique to evaluate how various factors can affect the environmental impact of the building construction phase (for onsite or offsite construction methods). The system dynamic model (using Vensim software) that was developed provides a platform that allows users to input variables such as the distance that is expected for transportation of labor, material, and equipment to both the onsite facility and the offsite construction location, factors associated with the use of equipment for construction, the distance needed for transportation of building panels or modules from the offsite facility to the final site, etc. Among other things, the model showed that an increase in the distance from the offsite yard to the final construction site increases the total impacts of transportation of completed modules. An increase in the number of trips for the transportation of material to the onsite construction location increases the total impact of onsite construction. In terms of the environmental impact of construction, none of the two methods of construction gives an absolute superiority over the other. The environmental performance of offsite and onsite depends on various associated factors. It is recommended that building practitioners review various factors that are peculiar to their projects to make an informed decision on the best construction methods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.